Guide

Goods receiving: what to reject on the spot and how to record it

Quantity, temperature, integrity, and lot: acceptance and rejection criteria, with the minimum record that sustains the claim.

Receiving is the last point where a problem can still be rejected. Quantity and weight, temperature, integrity with a legible lot, and the document are checked; whatever fails is set aside and recorded with evidence, supplier, and owner.

  • Broken cold chain: full rejection
  • Legible lot and shelf life
  • Rejection set aside and recorded

How it works

Wobistro preserves the source, identifies the exception, prepares an action within permissions, and records the responsible person's decision. Every result returns to the history so the next shift starts with context.

Reviewed

Source: Wobistro Editorial · 2026-09-21

Help & support