Skip to content
Wobistro

Multi-brand dark kitchen

A multi-brand dark kitchen runs one line per brand, shares stores and prep, and ends in packing and a courier hand-off instead of a dining room.

Zones

Clean side

  • Receiving dock
  • Dry store
  • Chilled store
  • Prep
  • Brand line 1
  • Brand line 2
  • Brand line 3
  • Packing
  • Courier handoff

Dirty side

  • Pot wash
  • Waste staging

Flows

Clean flow

Dirty return

Space programme

At 180 covers a day and 2 days between deliveries, with the planner’s default menu for this concept.

ZoneFlowArea (m²)
Receiving dockClean side6.7
Dry storeClean side6.9
Chilled storeClean side8.3
PrepClean side8.3
Brand line 1Clean side9.2
Brand line 2Clean side9.2
Brand line 3Clean side9.2
PackingClean side8.8
Courier handoffClean side6.4
Pot washDirty side8.6
Waste stagingDirty side6
Peak-hour covers
38.9
Working zones
87.6 m²
Circulation allowance (25%)
21.9 m²
Total kitchen area
109.5 m²

By daily covers

Daily coversPeak-hour coversWorking zones (m²)Total kitchen area (m²)
10021.680.5100.6
30064.899.3124.1
600129.6129.9162.4

Equipment the planner places

Starting equipment for each zone, before you edit it. Linked items have their own pages.

Receiving dock
Stainless prep table, Wire shelving
Dry store
2 × Wire shelving
Chilled store
Reach-in fridge, Reach-in freezer
Prep
Stainless prep table, Hand sink
Brand line 1
Stainless prep table, Hand sink, Griddle, Fryer
Brand line 2
Stainless prep table, Hand sink, Griddle, Fryer
Brand line 3
Stainless prep table, Hand sink, Griddle, Fryer
Packing
Stainless prep table, Takeaway shelf, Hand sink, Beverage dispenser, Heated pass
Courier handoff
Takeaway shelf
Pot wash
Three-compartment sink, Hand sink
Waste staging
Tray return and waste, Mop sink

How the programme is sized

Each zone takes the larger of two figures: a base area plus an allowance per peak-hour cover, or the fitted equipment with its front working space plus 18%.

Stores grow with the number of days between deliveries. In multi-brand kitchens each brand line takes its share of the peak.

Circulation adds 25% over the working zones. The U.S. Department of Veterans Affairs food service planning criteria use a 1.25 net-to-department-gross factor in their own context.

The zone allowances themselves are Wobistro planning estimates, not ratios published by either source. Confirm corridor widths with loaded trolley sizes, turning space and doors.

VA Nutrition and Food Service planning criteria, chapter 224 · WBDG food service design guide

Generate one in the studio

An example venue built with this programme:

In the studio, start a new venue and choose Plan a kitchen. Pick this concept, enter your covers, brands and delivery days, and the planner draws the zones and places the starting equipment.

Open “Three-brand dark kitchen” in the studio Open the studio

Planning estimates. Have your project team verify equipment, utilities and layout.