Skip to content
Wobistro

À la carte brigade

An à la carte brigade splits the hot line into saucier, grill, fry and pastry sections behind a central pass, with a separate pot wash.

Zones

Clean side

  • Receiving dock
  • Dry store
  • Chilled store
  • Prep
  • Cold kitchen / garde manger
  • Saucier
  • Grill
  • Fry station
  • Pastry
  • Pass
  • Service handoff

Dirty side

  • Pot wash
  • Dish wash
  • Waste staging

Flows

Clean flow

Dirty return

Space programme

At 180 covers a day and 2 days between deliveries, with the planner’s default menu for this concept.

ZoneFlowArea (m²)
Receiving dockClean side6.7
Dry storeClean side6.9
Chilled storeClean side8.3
PrepClean side8.3
Cold kitchen / garde mangerClean side7.6
SaucierClean side7.7
GrillClean side7.7
Fry stationClean side6
PastryClean side10.3
PassClean side9.3
Service handoffClean side7.1
Pot washDirty side8.6
Dish washDirty side8.1
Waste stagingDirty side6
Peak-hour covers
38.9
Working zones
108.6 m²
Circulation allowance (25%)
27.2 m²
Total kitchen area
135.8 m²

By daily covers

Daily coversPeak-hour coversWorking zones (m²)Total kitchen area (m²)
10021.698.3122.9
30064.8127.9159.9
600129.6174.8218.5

Equipment the planner places

Starting equipment for each zone, before you edit it. Linked items have their own pages.

Receiving dock
Stainless prep table, Wire shelving
Dry store
2 × Wire shelving
Chilled store
Reach-in fridge, Reach-in freezer
Prep
Stainless prep table, Hand sink
Cold kitchen / garde manger
Refrigerated prep rail, Hand sink
Saucier
Six-burner range, Hand sink, Combi oven
Grill
Charbroiler, Hand sink
Fry station
Fryer, Hand sink
Pastry
Planetary mixer, Stainless prep table, Speed rack, Hand sink
Pass
Heated pass, Hand sink, Bar counter
Service handoff
Server station
Pot wash
Three-compartment sink, Hand sink
Dish wash
Dish table, Hand sink, Undercounter dishwasher
Waste staging
Tray return and waste, Mop sink

How the programme is sized

Each zone takes the larger of two figures: a base area plus an allowance per peak-hour cover, or the fitted equipment with its front working space plus 18%.

Stores grow with the number of days between deliveries. In multi-brand kitchens each brand line takes its share of the peak.

Circulation adds 25% over the working zones. The U.S. Department of Veterans Affairs food service planning criteria use a 1.25 net-to-department-gross factor in their own context.

The zone allowances themselves are Wobistro planning estimates, not ratios published by either source. Confirm corridor widths with loaded trolley sizes, turning space and doors.

VA Nutrition and Food Service planning criteria, chapter 224 · WBDG food service design guide

Generate one in the studio

In the studio, start a new venue and choose Plan a kitchen. Pick this concept, enter your covers, brands and delivery days, and the planner draws the zones and places the starting equipment.

Open the studio

Planning estimates. Have your project team verify equipment, utilities and layout.