Skip to content
Wobistro

Hotel kitchens

Hotel kitchens split over two floors: receiving, stores, butchery, cold kitchen and pastry below; the main line, banquet kitchen, room service and staff canteen above.

Zones

Ground floor

Clean side

  • Receiving dock
  • Dry store
  • Chilled store
  • Freezer store
  • Prep
  • Butchery
  • Cold kitchen / garde manger
  • Pastry

Dirty side

  • Pot wash
  • Dish wash
  • Waste staging

Upper floor

Clean side

  • Main cook line
  • Banquet kitchen
  • Banquet plating
  • Pass
  • Service handoff
  • Room service
  • Staff canteen
  • Chef’s office

Dirty side

  • Dish wash
  • Waste staging

Flows

Clean flow

Dirty return

Space programme

At 180 covers a day and 2 days between deliveries, with the planner’s default menu for this concept.

ZoneFlowArea (m²)
Receiving dockClean side6.7
Dry storeClean side6.9
Chilled storeClean side8.3
Freezer storeClean side6.2
PrepClean side8.3
ButcheryClean side8.4
Cold kitchen / garde mangerClean side7.6
PastryClean side10.3
Pot washDirty side8.6
Dish washDirty side8.1
Waste stagingDirty side6
Main cook lineClean side11.5
Banquet kitchenClean side18.2
Banquet platingClean side14.3
PassClean side6.9
Service handoffClean side7.1
Room serviceClean side7.9
Staff canteenClean side12.1
Chef’s officeClean side7.2
Dish washDirty side8.1
Waste stagingDirty side6
Peak-hour covers
38.9
Working zones
184.7 m²
Circulation allowance (25%)
46.2 m²
Total kitchen area
230.9 m²

By daily covers

Daily coversPeak-hour coversWorking zones (m²)Total kitchen area (m²)
10021.6165.1206.4
30064.8214.9268.6
600129.6289.8362.3

Equipment the planner places

Starting equipment for each zone, before you edit it. Linked items have their own pages.

Receiving dock
Stainless prep table, Wire shelving
Dry store
2 × Wire shelving
Chilled store
Reach-in fridge
Freezer store
Reach-in freezer
Prep
Stainless prep table, Hand sink
Butchery
Stainless prep table, Hand sink, Reach-in fridge
Cold kitchen / garde manger
Refrigerated prep rail, Hand sink
Pastry
Planetary mixer, Stainless prep table, Speed rack, Hand sink, Convection oven
Pot wash
Three-compartment sink, Hand sink
Dish wash
Dish table, Hand sink, Undercounter dishwasher
Waste staging
Tray return and waste, Mop sink
Main cook line
Stainless prep table, Hand sink, Six-burner range, Charbroiler, Combi oven
Banquet kitchen
Combi oven, Stainless prep table, Hand sink
Banquet plating
Stainless prep table, Holding cabinet, Hand sink
Pass
Heated pass, Hand sink
Service handoff
Server station
Room service
Stainless prep table, Holding cabinet
Staff canteen
Buffet island
Chef’s office
Stainless prep table
Dish wash
Dish table, Hand sink
Waste staging
Tray return and waste, Mop sink

How the programme is sized

Each zone takes the larger of two figures: a base area plus an allowance per peak-hour cover, or the fitted equipment with its front working space plus 18%.

Stores grow with the number of days between deliveries. In multi-brand kitchens each brand line takes its share of the peak.

Circulation adds 25% over the working zones. The U.S. Department of Veterans Affairs food service planning criteria use a 1.25 net-to-department-gross factor in their own context.

The zone allowances themselves are Wobistro planning estimates, not ratios published by either source. Confirm corridor widths with loaded trolley sizes, turning space and doors.

VA Nutrition and Food Service planning criteria, chapter 224 · WBDG food service design guide

Generate one in the studio

An example venue built with this programme:

In the studio, start a new venue and choose Plan a kitchen. Pick this concept, enter your covers, brands and delivery days, and the planner draws the zones and places the starting equipment.

Open “Hotel kitchens across two floors” in the studio Open the studio

Planning estimates. Have your project team verify equipment, utilities and layout.