Central production

A central production kitchen cooks in volume, cools and holds food, then packs and dispatches it to other sites.

Zones

Clean side

  • Receiving dock
  • Dry store
  • Chilled store
  • Freezer store
  • Prep
  • Main cook line
  • Cooling and holding
  • Packing
  • Dispatch

Dirty side

  • Pot wash
  • Dish wash
  • Waste staging

Flows

Clean flow

Dirty return

Space programme

At 180 covers a day and 2 days between deliveries, with the planner’s default menu for this concept.

ZoneFlowArea (m²)
Receiving dockClean side6.7
Dry storeClean side6.9
Chilled storeClean side8.3
Freezer storeClean side6.2
PrepClean side8.3
Main cook lineClean side11.5
Cooling and holdingClean side9.5
PackingClean side8.5
DispatchClean side9.7
Pot washDirty side8.6
Dish washDirty side8.1
Waste stagingDirty side6
Peak-hour covers
38.9
Working zones
98.3 m²
Circulation allowance (25%)
24.6 m²
Total kitchen area
122.9 m²

By daily covers

Daily coversPeak-hour coversWorking zones (m²)Total kitchen area (m²)
10021.687.8109.8
30064.8115.3144.1
600129.6159.8199.8

Equipment the planner places

Starting equipment for each zone, before you edit it. Linked items have their own pages.

Receiving dock
Stainless prep table, Wire shelving
Dry store
2 × Wire shelving
Chilled store
Reach-in fridge
Freezer store
Reach-in freezer
Prep
Stainless prep table, Hand sink, Refrigerated prep rail
Main cook line
Stainless prep table, Hand sink, Combi oven, Six-burner range, Convection oven
Cooling and holding
Reach-in fridge, Speed rack
Packing
Stainless prep table, Takeaway shelf, Hand sink, Heated pass
Dispatch
Wire shelving, Holding cabinet
Pot wash
Three-compartment sink, Hand sink
Dish wash
Dish table, Hand sink
Waste staging
Tray return and waste, Mop sink

How the programme is sized

Each zone takes the larger of two figures: a base area plus an allowance per peak-hour cover, or the fitted equipment with its front working space plus 18%.

Stores grow with the number of days between deliveries. In multi-brand kitchens each brand line takes its share of the peak.

Circulation adds 25% over the working zones. The U.S. Department of Veterans Affairs food service planning criteria use a 1.25 net-to-department-gross factor in their own context.

The zone allowances themselves are Wobistro planning estimates, not ratios published by either source. Confirm corridor widths with loaded trolley sizes, turning space and doors.

VA Nutrition and Food Service planning criteria, chapter 224 · WBDG food service design guide

Generate one in the studio

An example venue built with this programme:

In the studio, start a new venue and choose Plan a kitchen. Pick this concept, enter your covers, brands and delivery days, and the planner draws the zones and places the starting equipment.

Open “Central production commissary” in the studio Open the studio

Planning estimates. Have your project team verify equipment, utilities and layout.