Catering
A catering kitchen prepares, cooks and chills food for events, then packs and dispatches it.
Zones
Clean side
- Receiving dock
- Dry store
- Chilled store
- Prep
- Cold kitchen / garde manger
- Main cook line
- Cooling and holding
- Packing
- Dispatch
Dirty side
- Pot wash
- Dish wash
- Waste staging
Flows
Clean flow
- Receiving dock , Dry store
- Receiving dock , Chilled store
- Dry store , Prep
- Chilled store , Cold kitchen / garde manger
- Receiving dock , Dry store , Prep , Main cook line , Cooling and holding , Packing , Dispatch
Dirty return
- Dirty return , Pot wash , Dish wash , Waste staging , Waste exit
Space programme
At 180 covers a day and 2 days between deliveries, with the planner’s default menu for this concept.
| Zone | Flow | Area (m²) |
|---|---|---|
| Receiving dock | Clean side | 6.7 |
| Dry store | Clean side | 6.9 |
| Chilled store | Clean side | 8.3 |
| Prep | Clean side | 8.3 |
| Cold kitchen / garde manger | Clean side | 7.6 |
| Main cook line | Clean side | 11.5 |
| Cooling and holding | Clean side | 9.5 |
| Packing | Clean side | 13.7 |
| Dispatch | Clean side | 9.7 |
| Pot wash | Dirty side | 8.6 |
| Dish wash | Dirty side | 8.1 |
| Waste staging | Dirty side | 6 |
- Peak-hour covers
- 38.9
- Working zones
- 104.9 m²
- Circulation allowance (25%)
- 26.2 m²
- Total kitchen area
- 131.1 m²
By daily covers
| Daily covers | Peak-hour covers | Working zones (m²) | Total kitchen area (m²) |
|---|---|---|---|
| 100 | 21.6 | 94.5 | 118.1 |
| 300 | 64.8 | 123.8 | 154.8 |
| 600 | 129.6 | 170.7 | 213.4 |
Equipment the planner places
Starting equipment for each zone, before you edit it. Linked items have their own pages.
How the programme is sized
Each zone takes the larger of two figures: a base area plus an allowance per peak-hour cover, or the fitted equipment with its front working space plus 18%.
Stores grow with the number of days between deliveries. In multi-brand kitchens each brand line takes its share of the peak.
Circulation adds 25% over the working zones. The U.S. Department of Veterans Affairs food service planning criteria use a 1.25 net-to-department-gross factor in their own context.
The zone allowances themselves are Wobistro planning estimates, not ratios published by either source. Confirm corridor widths with loaded trolley sizes, turning space and doors.
VA Nutrition and Food Service planning criteria, chapter 224 · WBDG food service design guide
Generate one in the studio
In the studio, start a new venue and choose Plan a kitchen. Pick this concept, enter your covers, brands and delivery days, and the planner draws the zones and places the starting equipment.
Open the studioOther kitchen plans
Planning estimates. Have your project team verify equipment, utilities and layout.